When Should BDA Systems Be Installed?

  • Mar 16, 2021
  • 1 min read


During the construction of any project there is a phase where BDA Systems are most easily installed.


An initial signal strength survey should be completed to determine whether or not the current signal strength in a building is acceptable. This is how it is determined whether or not a BDA system is needed.

There is a small time frame where a significant amount of work needs to occur. Survey, design, delivery and installation of a BDA system should take about 6 weeks.


The photo illustrates an optimal time for Life Safety Systems, LLC to be called in to perform a BDA Survey and installation. It shows exterior walls, windows and roof completed which provides accurate signal strength readings for a code compliant system.

 
 
 
Need more details? Contact us!